Office Generators: Backup Power for Offices and Office Parks
Office generators keep your team working when the grid goes down: computers, servers, Wi-Fi, phones, lights, aircons and lifts. We supply and install office generators for every size of office in South Africa, from a 10-person practice to multi-storey office blocks and business parks, with an automatic transfer switch so power is back within seconds, and our own team handling the installation.

Office generators: what size do you need?
| Office | What keeps running | Typical size | Example |
|---|---|---|---|
| Small office, up to about 15 people | Computers, Wi-Fi, phones, lights, a few aircons, kitchen | 20 to 30kVA | 20kVA Himoinsa, 30kVA Stephill |
| Medium office, 20 to 50 people | The above, plus a server room and more aircons | 40 to 65kVA | 45kVA Hyundai, 60kVA Hyundai |
| Large office or small block | Several floors, lifts, central HVAC, server room | 85 to 200kVA | 88kVA Cat (quiet), 200kVA Cat |
| Office block or business park | Multiple buildings, lifts, HVAC, security, data rooms | 250 to 500kVA | 250kVA Pramac, 400kVA Cat |
The surest way to size it is the maximum demand on your electricity bill. Send it to us and we’ll size your office generator for free; see our business sizing guide for how it works.
What office generators need to get right
- Fast switchover. An automatic transfer switch starts the generator and switches over within seconds of an outage. See ATS installation.
- UPS for servers and computers. A generator takes a few seconds to take over. A UPS covers that gap, so servers and PCs never lose power, then the generator carries the load.
- Lifts and HVAC. Lifts and central aircon have big starting loads; we size for them, or stage them so they start one after another.
- Noise. In business parks and mixed-use areas, a quiet canopy matters; see generator noise laws.
- Fuel for long outages. Larger offices often add bulk storage; see fuel management.

Large office generators
For office blocks and business parks, the generator is usually 100kVA or more, installed on a plinth with heavy switchgear and often a prime rating for long outages. We handle the full project: base, cabling, switchgear, commissioning and a load test. See our 400kVA guide, prime vs standby ratings and load bank testing.

Installation and maintenance
We install office generators with our own team, including the transfer switch and a Certificate of Compliance from a registered electrician. Afterwards, a service plan and remote monitoring keep it ready. See our generator installation service and commercial generators.
Get an office generator quote, or call or WhatsApp +27 68 878 5922.
Running an office in Sandton, Rosebank or Midrand? See generators for sale in Johannesburg for typical office sizes and prices.
Running an office in Hatfield, Menlyn or Centurion? See generators for sale in Pretoria.
Frequently asked questions
What size generator does an office need?
A small office of up to about 15 people usually needs 20 to 30kVA; a medium office 40 to 65kVA; larger buildings 85kVA and up.
Do I need a UPS as well as a generator?
For servers and computers, yes. The UPS covers the few seconds before the generator takes over.
Can an office generator run the lifts?
Yes, when it’s sized for the lift’s starting load. We check this when sizing.
Do you install generators in business parks?
Yes, including multi-building sites and shared generators for several tenants.
Not sure which size you need?
Tell us what you want to power and where. We will recommend the right generator and send you a written quote.