A standby generator that starts every month on test hasn’t proved anything. The real question is whether it can carry your full load for hours when the grid goes down. Load bank testing answers that. We connect a controlled electrical load to the generator, step it up to its rating, and watch how it performs, before a real outage does it for you.

Load bank testing: the 170kVA Cummins diesel generator
The 170kVA Cummins diesel generator

Why it matters

  • It proves capacity. Many standby sets have never run anywhere near full load until the day they’re needed.
  • It finds faults early: overheating, voltage drops, fuel starvation or governor problems that only show under load.
  • It cleans the engine. Diesels that run lightly build up unburnt fuel and soot, called wet stacking. A good load run burns it off.
  • It gives you a record for insurers, auditors and compliance.

What load bank testing involves

  1. A check of the generator before we start: fluids, battery, connections and alarms.
  2. Connecting a load bank, a portable bank of resistors that safely absorbs the generator’s power.
  3. Stepping the load up in stages to the rating you need to prove.
  4. Monitoring voltage, frequency, temperatures and oil pressure throughout the run.
  5. A written report with the results and anything that needs attention.

Who needs load bank testing

Hospitals and clinics, data rooms, shopping centres, factories and any business where the generator is critical. It’s also worth doing after a major repair, when a site’s load has grown, or on generators that mostly run lightly. For sizing a site in the first place, see our business sizing guide.

To discuss load bank testing, call or WhatsApp +27 68 878 5922, or request a quote. See all our generator services.

How long does a load bank test take?

For most commercial generators, a test runs for a few hours, stepping the load up in stages and holding it while we watch temperatures, pressures, voltage and frequency. Larger and critical sets may be tested for longer to prove sustained performance. We agree the test plan with you before the day.

What if the generator fails the test?

That’s exactly why you test: it’s far better to find a weak point on a planned day than during a real outage. Common findings include cooling problems, fuel supply restrictions, a weak battery or governor issues. We explain what we found, quote the fix, and retest once it’s done. See generator repairs.

Frequently asked questions

How often should a generator be load tested?

For critical standby sets, at least once a year is common practice. Your insurer or industry rules may require more.

Will my building lose power during the test?

No. The load bank provides the load, so your site stays on the grid while we test.

Can small generators be load tested?

Yes, although it’s most valuable on commercial and industrial sets.

Do you test generators of any brand?

Tell us the make, model and size, and we’ll confirm the test plan for your set.