22kVA Generator: Hyundai vs Cummins, Price and Specs
Both of our 22kVA generators give you the same 16kW of three-phase power. One costs R48,900 and the other R75,900. So what does the extra R27,000 get you? This 22kVA generator comparison puts the Hyundai and the Cummins side by side so you can decide which one suits your business.

Hyundai 22kVA vs Cummins C22D5Q side by side
| Specification | Hyundai 22kVA | Cummins C22D5Q |
|---|---|---|
| Price | R48,900 excl. VAT / R56,235 incl. VAT | R75,900 excl. VAT / R87,285 incl. VAT |
| Continuous power | 20kVA / 16kW | 20kVA / 16kW (prime) |
| Maximum power | 22kVA | 22kVA / 18kW (standby) |
| Engine | Hyundai HY490, 4 cylinder, 2540cc, 1500rpm | Cummins X2.5-G2, 1500rpm |
| Alternator | Hyundai with AVR | Stamford S0L2-G1 |
| Control panel | Standard, with ATS connection | Cummins PowerStart 0600 |
| Fuel tank | 77.5 litres | 55 litres |
| Noise | 65dB(A) at 7m | 65dB(A) at 7m |
| Weight | 760kg | 715kg |
| Size (L x W x H) | 1900 x 900 x 1100mm | 1960 x 820 x 1285mm |
Where they are the same
On paper these two are closer than the price suggests. Both are three-phase 400V generators rated at 16kW continuous. Both run at 1500rpm, which is what you want for long hours. Both sit in silent canopies at 65dB(A) at 7 metres, and both can be wired to an automatic transfer switch so they start by themselves when the power goes.
Why the Cummins costs more

You are paying for the engine, the alternator and the support behind them. The X2.5 engine and Stamford alternator are used in generators all over the world, and Cummins runs its own dealer and parts network in South Africa. The PowerStart panel gives proper engine protection and clear readouts. For a clinic, a cold store or any business where an hour without power costs real money, that track record is worth having.
Cummins also publishes its fuel figures: 5.2 litres an hour at full load. With a 55-litre tank, that is about 10 hours flat out and a good deal more at a normal working load. If you need longer unattended running, an external tank can be added.
Why the Hyundai is still a strong buy

The Hyundai gives you the same 16kW for R27,000 less and carries more diesel, 77.5 litres against 55. Its 2.5-litre four-cylinder engine also runs at 1500rpm, so this is not a lightweight weekend generator. For standby use in an office, shop, farm or larger home with a three-phase supply, where it covers outages rather than running every day, the Hyundai does the job well, and the saving can pay for the installation and an automatic transfer switch.
What a 22kVA generator runs
Across three phases, 16kW gives you about 5.3kW per phase. That is enough for an office of 10 to 15 people with aircons, a butchery or small supermarket with fridges and freezers, or a workshop with a compressor and a few three-phase machines. Your electrician balances the loads across the phases when wiring it in. If you are not sure of your total load, our business generator sizing guide helps you add it up.
Which one should you buy?
- Choose the Hyundai if budget comes first and the generator will mostly cover outages.
- Choose the Cummins if the generator protects income every hour it runs, you plan to keep it for ten years or more, or you want a brand any technician knows.
- Choose neither if your building is single phase. Look at the 16kVA single-phase Hyundai or the 25kVA single-phase Hyundai instead.
Want the third option at this size too? Our 20kVA generator price guide adds the Himoinsa 20kVA, with its 115-litre tank, to the comparison.
Frequently asked questions
How much is a 22kVA generator?
The Hyundai 22kVA is R48,900 excl. VAT / R56,235 incl. VAT and the Cummins C22D5Q is R75,900 excl. VAT / R87,285 incl. VAT, before delivery and installation.
Is a 22kVA generator single or three phase?
Both of ours are three phase. For a single-phase property, the 25kVA single-phase Hyundai is the closest match.
How many kW is a 22kVA generator?
16kW continuous, with a little more available on standby. Our prime vs standby explainer explains the two ratings.
Still deciding? Get a quote for both and we will talk you through the difference for your site.